Process Stability – biopm, llc https://biopmllc.com Improving Knowledge Worker Productivity Sun, 13 Dec 2020 20:07:46 +0000 en-US hourly 1 https://wordpress.org/?v=6.7.1 https://biopmllc.com/wp-content/uploads/2024/07/cropped-biopm_512w-32x32.png Process Stability – biopm, llc https://biopmllc.com 32 32 193347359 Understanding Process Capability https://biopmllc.com/operations/understanding-process-capability/ https://biopmllc.com/operations/understanding-process-capability/#comments Sat, 01 Aug 2020 03:17:57 +0000 https://biopmllc.com/?p=1196 Continue reading Understanding Process Capability]]> Process capability is a key concept in Quality and Continuous Improvement (CI).  For people not familiar with the concept, process capability is a process’s ability to consistently produce product that meets the customer requirements.

Conceptually, process capability is simple.  If a process makes products that meet the customer requirements all the time (i.e. 100%), it has a high process capability.  If the process does it only 80% of the time, it is not very capable.

For quality attributes measured as continuous or variable data, many organizations use Process Capability Index (Cpk) or Process Performance Index (Ppk) as the metric for evaluation.  In my consulting work, I often observe confusion and mistakes applying the concept and associated tools, even by Quality and CI professionals.  For example,

  • Mix-up of Cpk and Ppk
  • Unclear whether or when process stability is a prerequisite
  • Using the wrong data (sampling) or calculation
  • Misinterpretation of process capability results
  • Difficulty evaluating processes with non-normal data, discrete data, or binary outcomes

The root cause of this gap between this simple concept and its effective application in the real world, in my opinion, is lack of fundamental understanding of statistics by the practitioners.

Statistics

First, a process capability metric, such as Cpk, is a statistic (which is, by definition, simply a function of data).  The function is typically given as a mathematical formula.  For example, mean (or the arithmetic average) is a statistic and is the sum of all values divided by the number of values in the data set.   

The confusion between Cpk and Ppk often comes from their apparently identical formulas, with the only difference being the standard deviation used.  Cpk uses the within-subgroup variation, whereas Ppk uses the overall variation in the data.  Which index should one use in each situation?

It is important to understand that any function of data can be a statistic – whether it has any useful meaning is a different thing.  The formula itself of a statistic does not produce the meaning.  Plugging whatever existing data into a formula rarely gives the answer we want. 

To derive useful meaning from a statistic, we must first define our question or purpose and state assumptions and constraints.  Then we can identify the best statistic, gather suitable data, calculate and interpret the result. 

Enumerative and Analytic Studies

Enumerative and analytic studies1 have two distinct purposes. 

  • An enumerative (or descriptive) study is aimed to estimate some quantity in the population of interest, for example, how many defective parts are in this particular lot of product? 
  • An analytic (or comparative) study tries to understand the underlying cause-system or process that generates the result, for example, why does the process generate so many defective parts?

If the goal is to decide if a particular lot of product should be accepted or rejected based on the number of defective parts, then it is appropriate to conduct an enumerative study, e.g. estimating the proportion of defectives based on inspection of a sample from the lot.  A relevant consideration is sample size vs. economic cost – more precise estimates require larger samples and therefore cost more.  In fact, a 100% inspection will give us a definite answer.  In this case, we are not concerned with why there are so many defectives, just how many.

If the goal is to determine if a process is able to produce a new lot of product at a specified quality level, it is an analytic problem because we first have to understand why (i.e. under what conditions) it produces more or fewer defectives.  Methods used in enumerative studies are inadequate to answer this question even if we measured all parts produced so far.  In contrast, control charts are a powerful analytic method that uses carefully designed samples (rational subgroups) over time to isolate the sources of variation in the process, i.e. understanding the underlying causes of the process outcome.  This understanding allows us to determine if the process is capable or needs improvement.

Cpk versus Ppk

If our goal is to understand the performance of the process in a specific period (i.e. an enumerative study), we are only concerned with the products already made, not the inherent, potential capability of the process to produce quality products in the future.  In this case, demonstration of process stability (by using control charts) is not required, and Ppk using a standard deviation that represents the overall variability from the period is appropriate.  

If our goal is to plan for production, which involves estimating product quality in future lots, the process capability analysis is an analytic study.  Because we cannot predict what a process will produce with confidence if it is not stable, demonstration of process stability is required before estimating process capability. 

If the process is stable, there is no difference between within-subgroup variation (which is used for Cpk) and overall variation (which is used for Ppk), except estimation errors. Therefore, Cpk and Ppk are equivalent.

If the process is not stable, the overall standard deviation is greater than the within-subgroup variation — Ppk is less than Cpk as expected.  However, Ppk is not a reliable measure of future performance because an unstable process is unpredictable.  If (a big IF) the subgroup is properly designed, the within-subgroup variation is stable and Cpk can be interpreted as the potential process capability if all special causes are eliminated.  In practice, the subgroup is often not designed or specified thoughtfully, making interpreting Cpk difficult.

In summary, process capability analysis requires good understanding of statistical concepts and clearly defined goals.  Interested practitioners should peruse many books and articles on this topic.  I hope the brief discussion here helps clarify some concepts. 

1. Deming included a chapter “Distinction between Enumerative and Analytic Studies” in his book Some Theory of Sampling (1950).

]]>
https://biopmllc.com/operations/understanding-process-capability/feed/ 2 1196
Achieving Improvement https://biopmllc.com/strategy/achieving-improvement/ https://biopmllc.com/strategy/achieving-improvement/#comments Tue, 30 Jun 2020 12:11:53 +0000 https://biopmllc.com/?p=1186 Continue reading Achieving Improvement]]> In my blog Setting SMART Goals, I made the point that having a measurable goal in an improvement project is not enough — we have to know how it is measured and interpreted to make it useful.

What makes a goal achievable?  In my work as a Continuous Improvement (CI) coach and consultant, I have seen some common practices setting a numerical goal using, for example

  1. A target set by management, e.g. a productivity standard for the site
  2. Customer requirements, e.g. a minimum process capability
  3. Some benchmark value from a similar process
  4. A number with sufficient business benefit, e.g. 10% improvement

At the first glance, these methods seem reasonable.  In practice, they are problematic for two reasons.

First, the goals are based on what is desirable, not sound understanding of the opportunity using data.  How do we know if a desirable goal is achievable?   In many organizations, a numerical goal is “set in stone” when the project starts; failing to achieve the goal can have potential career repercussions.  While management tends to aim for aggressive targets, the project leaders are more concerned with the risk of failing to achieve them.  They prefer a more “realistic” target that can be met or even exceeded and negotiate with the sponsors to make the desirable target a “stretch” goal.  In the end, no one knows what the real improvement opportunity is.

Secondly, the practices create a mindset and behavior inconducive to the CI culture.  I have seen too many organizations’ Lean, Six Sigma, or other CI initiatives focus only on training and project execution.  They fail to build CI into their daily decisions, operations, and organization’s culture.  Quality improvement cannot be accomplished by projects alone – numerous incremental improvement opportunities exist in routine activities outside any project.  Projects, by their nature, are of a limited duration and are merely one mechanism or component of continuous improvement. Most improvement does not require a project.  Depending on projects to improve a process is a misunderstanding of CI, reinforces reactive (firefighting) behavior, and sends a wrong message to the organization that improvement is achieved through projects, and even worse, by specialists.

Creating a project with only a desired target leads to high uncertainty in project scope, resources, and timelines – a lot of waste. 

To be effective, a CI project should have a specific opportunity identified based on systematic analysis of the process.  Furthermore, the opportunity is realized through a project only if it requires additional and/or specialized resources; otherwise, the improvement should be carried out within routine activities by the responsible people in collaboration. 

What kind of systematic analysis should we perform to identify the opportunities?

One powerful analysis is related to process stability.  It requires our understanding of the nature and sources of variation in a process or system.  In a stable process, there is only common cause variation – its performance is predictable.  If a process is not stable, there exists special cause variation — its performance is not predictable.  Depending on process stability, the opportunity for improvement and the approach are distinct. 

The first question I ask about the goal of any improvement project is “Is the current performance unexpected?”  In other words, is the process performing as predicted?  No project should start without answering this question satisfactorily in terms of process stability.  Most often the answer is something like “We don’t really know but we want something better.”  If you don’t know where you are, how do you get to where you want to be?  This is a typical symptom of a project driven by the desirability rather than a specific opportunity based on analysis.  If the process stability was examined, most likely the first step toward improvement would be to understand and reduce process variation, which does not need a project.

For people familiar with Deming’s 14 Points for Management, I have said nothing new.  I merely touched point 11 “Eliminate management by numbers, numerical goals.”  His original words1 are illustrative.

“If you have a stable system, then there is no use to specify a goal.  You will get whatever the system will deliver.  A goal beyond the capability of the system will not be reached.”

“If you have not a stable system, then there is again no point in setting a goal.  There is no way to know what the system will produce: it has no capability.”

A goal statement that sounds SMART does not make a project smart.  A project devoid of true improvement opportunity achieves nothing but waste.  But if we follow the path shown by Deming, opportunities abound and improvement continues. 


1. Deming, W. Edwards. Out of the Crisis : Quality, Productivity, and Competitive Position. Cambridge, Mass.: Massachusetts Institute of Technology, Center for Advanced Engineering Study, 1986.

]]>
https://biopmllc.com/strategy/achieving-improvement/feed/ 2 1186